The Log Home Neighborhood

An online log home community for log home enthusiasts.

The cabin has been bustling with activity. In rapid succession, the gas was hooked up to theGE Cafe stove in the kitchen and water was run to the Native Trails hammered copper basinin the bathroom after Virginia Soapstone finished the top for the vanity, giving us both fire and water in the cabin. All of the utilities (other than the FiOS for the Internet) are now fully operational. Troy has wired in the light fixtures in the bathroom. About the only thing left for the bathroom is to seal the clay around the sink and lay in the floor molding. The room is small, but we knew it would be and we hope it won't be our primary bathroom but for so long. We have a door on order with frosted glass to let in a bit of light, since the bathroom has no windows.

Read more at: http://condemnationplantation.blogspot.com/2012/01/fire-and-water.html

Views: 49

Comment

You need to be a member of The Log Home Neighborhood to add comments!

Join The Log Home Neighborhood

Comment by John Duke on January 26, 2012 at 11:53am

Thanks, Denny. It is indeed a labor of love. We are almost finished with what I consider phase one, so it will be time soon to start getting excited about the next one.

John

Comment by Denny Johnson on January 26, 2012 at 11:44am

Wow! What an undertaking. I just spent quite a bit of time on your blog to see what you were building. Very cool! Thanks for sharing your progress.

© 2019   Created by Neighborhood Host.   Powered by

Guide to Log Homes | Advertise | Badges  |  Report an Issue  |  Terms of Service