Foundation, Drainage, and Delivery Day!!

So we finally have the drainage and foundation in, Most of the drainage rock and gravel was done by hand with a shovel and a wheel barrel. (I guees we will apreciate it more that way). After sealing the foundation and competing the We backfilled and finished the floor. All this work was done by My Father, My wife and Me. I really have to thank them for all the help. Finally after all of that we poured the floor and are ready to start the Sill plates, Girders, and Floor joices this weekend. We should get a lot done this week as I have the week off from work and I will be working on it 24/7. Hopefully we will be stacking logs soon!!!!! I have preped the ground for the Mound system and dug the septic tank hole. They should deliver the tank monday so I can start hooking all that up as well. I don't look forward to buying system sand.

Coming soon I will also be doing a review of some of the local businesses that we have been buying materials from and share some of the good and not so good experiences with them.

Views: 14

Comment

You need to be a member of The Log Home Neighborhood to add comments!

Join The Log Home Neighborhood

© 2019   Created by Neighborhood Host.   Powered by

Guide to Log Homes | Advertise | Badges  |  Report an Issue  |  Terms of Service